A rough layout of the vege patch. Trying to see where all the boards go & whether the area is large enough. Looks like Paul will be doing a little more digging on the left side.
The design is for 3 beds with 2 narrow paths between them. The boards will mostly sit above the ground around the beds and the path end boards will be sunk down.
The design is for 3 beds with 2 narrow paths between them. The boards will mostly sit above the ground around the beds and the path end boards will be sunk down.
So that's the first lot of boards stained. Now I have to do the second set! It takes ages to do them as each side requires 2 coats. And you need to leave each side to dry overnight. So that's 3 days per board!! Guess what I'll be doing this weekend :-)
No comments:
Post a Comment